I understand we are having massive flooding, so this post isn’t really about the flooding, but about why this project was way over the top. You can READ HERE all my posts going back to the beginning of the project 9 years ago and how something modest turned into a monster overnight due to a greedy developer making legal threats over a contract signed in the middle of the night with Mayor Munson.

That all aside, I did fight to keep the project modest, speaking at city council meetings and talking to councilors (Kermit was the only one that agreed). One of the options discussed, which would have been very reasonable and would have prevented any long term damage like the current situation we have was redoing the trail extra wide (like they did) and landscaping the entire area with natural rock and natural flowers and plants lining the river. Not only would have it been beautiful, it would have been very low maintenance. Instead we wasted millions on high maintenance infrastructure, as you can see above. And now we want to put a $2 million dollar effigy to egos on top of it all.

When a city decides to do projects like this, they really need to look at the long term costs of building such structures. I don’t even want to know what it will cost to repair all the damage from this latest flood. If we would have went with plan B, as I suggested, cleanup would have been a couple of people with rakes and some re-seeding, but instead we have Bread & Circus.

Exit mobile version