I had several city government nerds call me in frustration during the city council meetings this afternoon and tonight because the live stream was NOT working in SIRE (the online meeting portal). This has been happening a lot recently and on and off over the past decade with no fix or solution. The irony is the meetings still stream in citylink, so I just watch them there now instead of waiting for the Model T version of the meeting software to warm up. And how does that work? The cameras are rolling and feeding to CityLink but not to SIRE? Hmmm? I think the city deserves a Sooperhero award for at least being consistent over the past decade and not fixing the problem.

BRIDGE DISCOUNT? WHAT BRIDGE DISCOUNT?

Remember how we got duped out of $20 million dollars for a bridge that is only having the decking replaced? Public Works Director Cotter told councilors during the run up to the funding that they will get a $1.5 million dollar discount because they changed the timeline of the project (extended it). During the budget hearings today he said that hasn’t happened yet and mumbled something about legal. In other words, it will be like the $1 million dollar EC siding settlement that was our money in a contingency fund. This administration and it’s lackey’s will stop at nothing to cross the finish line, including lying about possible cost savings.

ANOTHER CITY FACILITY WE DON’T REALLY NEED

Also during the meeting this facility was mentioned to be planned for in 2026. It is interesting that they have architectural drawings of a facility the public knows nothing about. Maybe I missed it, but this was the first I heard about this project.

By l3wis